Assessment of reserves of raising effectiveness of using excavator and automobile complex on a coal mine
https://doi.org/10.17073/2072-1633-2021-1-89-96
Abstract
Maintaining high productivity of mining equipment is one of the key tasks in achieving the necessary competitiveness level at a coal mining company. As the coal stocks are becoming more and more complicated, the requirements for the quality of coal are raising and global price volatility is increasing, mining enterprises should operate more effectively than ever. The purpose of the study is to reveal and analyze reserves for raising effectiveness of exploiting the potential of excavator and automobile complex on a coal mine, and to develop organizational measures on their implementation. On order to achieve this goal the authors applied the following methods: chronometric observations to determine rational parameters of the cycles of loading and transportation of rock mass, the production experiment method to compare performance of excavator and automobile complex under different organizational conditions, working day photography to study the structure of the working day of the staff, graphic modelling of the working routine of excavator and automobile complex to reveal the opportunities for improving the consistency and rhythm of excavation and transportation. As a result, the study revealed unproductive work time of excavator and automobile complex which can be reserve for raising effectiveness of exploiting the equipment by 15–40%. In order to reduce loss of work time and to increase productivity of excavator and automobile complex the authors point out two directions: 1) higher quality of work conditions including improvement and maintenance of working platforms and roads; establishing appropriate traffi c routes; further training of excavator and truck drivers; 2) effi cient management of excavation and transportation in operation during a shift by means of controlling the rhythm of production.
About the Authors
A. I. ChernovRussian Federation
Aleksandr I. Chernov – 1st Deputy CEO
17 Dorozhnaya Str., Golubichnaya Station, Ul’yatovskiy District, Transbaikal Territory 674054
Т. A. Korkina
Russian Federation
Tatyana A. Korkina – Dr. Sci. (Econ.), Professor, Professor of the Department of State and Municipal Management; Head of Laboratory of Management of Staff Development (NIIOGR), Chelyabinsk State University; Professor of the Department of Management, South Ural State University
30 Entuziastov Str., Chelyabinsk 454048,
76 Leninskiy Ave., Chelyabinsk 454080
Yu. M. Oveshnikov
Russian Federation
Yuriy M. Oveshnikov – Dr. Sci. (Eng.), Head of Open Cast Mining Department, Professor
1 Kastrinskaya Str., Chita 672000
References
1. Artemiev V.B., Galkin V.A., Makarov A.M. Reserves for improving the production safety and efficiency of JSC “SUEK” during the recession. Ugol’. 2015;(2):31–33. (In Russ.).
2. Kaplan A.V. Management of socio-economic development of a mining enterprise. Moscow: Ekonomika; 2015. 270 p. (In Russ.).
3. Popov V.N., Gribin Yu.G., Garkavenko A.N., Rozhkov A.A., Melnikova A.S. Improvement of labor efficiency, quality and performance is the basic principle of coal mining enterprises cost efficiency and competitiveness. Ugol’. 2018;(10):60–65. (In Russ.). https://doi.org/10.18796/0041-5790-2018-10-60-65
4. Brinza V.V., Galiev Zh.K., Galieva N.V. et al. The development of science in the field of environmental economics and management of enterprises of the mining and metallurgical industries of Russia. Moscow: MISiS; 2017. 402 p.
5. Fedorov A.V., Velikosel’skii A.V., Mavrin V.A., Doroshenko A.A. et al. Results of the implementation of production improvement programs in units of a coal mining enterprise. Gornyi informatsionno-analiticheskiy byulleten’ = Mining Informational and Analytical Bulletin. 2012;(S2-6):5–43. (In Russ.).
6. Flesher N., Moyo M., Rehbach S., van Niekerk E. Productivity across the global mining sector is starting to improve. McKinsey & Company. June 22, 2018. URL: https://www.mckinsey.com/industries/metals-andmining/our-insights/productivity-across-the-globalmining-sector-is-starting-to-improve (accessed on 10.01.2020).
7. Kostarev A.S. The reserves of coal mining business. GIAB. Gornyi informatsionno-analiticheskiy byulleten’ = Mining Informational and Analytical Bulletin. 2013;(S4-1):687–862. (In Russ.).
8. Kostarev A.S. Approach to evaluating and implementing development reserves of a coal mining industrial association. GIAB. Gornyi informatsionnoanaliticheskiy byulleten’ = Mining Informational and Analytical Bulletin. 2014;(S5):114–126. (In Russ.).
9. Gribin Yu.G., Popov V.N, Rozhkov A.A. Integrated approach to identification of in-process reserves for mining enterprise social and economic management efficiency improvement. Ugol’. 2017;(4):36–41. (In Russ.). https://doi.org/10.18796/0041-5790-2017-4-36-41
10. Gibadullin Z.R., Makshukov F.Kh., Makarova V.A. Reserves for increasing the efficiency of using equipment time at the Sibaysky underground mine. GIAB. Gornyi informatsionno-analiticheskiy byulleten’ = Mining Informational and Analytical Bulletin. 2011;(5):283–287. (In Russ.).
11. Ushakov Yu.Yu. Justification of the parameters of the system of maintenance and repair of mining dump trucks. Cand. Eng. Sci. Diss. Ekaterinburg: Ural State Mining Univ.; 2016. 139 p. (In Russ.).
12. Zakharov S.I. Improving the efficiency of working processes of a coal mining enterprise on the basis of improving organizational and economic relations. Cand. econ. sci. diss. Synopsis. Chelyabinsk: South Ural State Univ.; 2011. 26 p. (In Russ.).
13. Tsinoshkin G.M., Samoylenko G.M., Dementieva S.A., Korkina T.A., Yablonskikh N.V. A methodology of analyzing the automated overburden removal production setup. Ugol’. 2018;(12):71–76. (In Russ.). https://doi.org/10.18796/0041-5790-2018-12-71-76.
14. Samoylenko A.G., Pronin A.S., Dovzhenok A.S., Zakharov S.I. Analysis of the quality of the organization of work of the complex overburden at the open-cast coal mine “Kharanorskiy”. GIAB. Gornyi informatsionnoanaliticheskiy byulleten’ = Mining Informational and Analytical Bulletin. 2018;(S50):118–123. (In Russ.). https://doi.org/10.25018/0236-1493-2018-12-50-118-123
15. Galkin V.A., Makarov A.M., Zakharov S.I., Poleshchuk M.N. Method of calculating the reserve of the working time of the coal producer staff for the purpose of its development. Izvestiya Ural’skogo gosudarstvennogo gornogo universiteta = News of the Ural State Mining University. 2019;(2):134–145. (In Russ.). https://doi.org/10.21440/2307-2091-2019-2-134-145
16. Khojasteh Y. Production management: Advanced models, tools, and applications for pull systems. New York: Productivity Press; 2017. 228 p.
17. Kahraman M.M., Rogers W.P., Dessureault S. Bottleneck identification and ranking model for mine operations. Production Planning & Control. 2020;31(14):1178-1194. https://doi.org/10.1080/09537287.2019.1701231
18. Bellgran M., Säfsten K. Production development: Design and operation of production systems. London: Springer-Verlag London Ltd; 2009. 340 p. https://doi.org/10.1007/978-1-84882-495-9
19. Rybinsky A.B., Gorokhov A.V., Dovzhenok A.S. Improvement of available machine time use control for dump trucks in Tugnuisky open pit mine. GIAB. Gornyi informatsionno-analiticheskiy byulleten’ = Mining Informational and Analytical Bulletin. 2015;(S45-2):325– 332. (In Russ.).
20. Unified mining standards for open cast mining for mining enterprises. Part IV Excavation and transportation of rock mass by dump trucks. 1988. URL: https://files.stroyinf.ru/Data2/1/4293836/4293836093.htm (In Russ.).
Review
For citations:
Chernov A.I., Korkina Т.A., Oveshnikov Yu.M. Assessment of reserves of raising effectiveness of using excavator and automobile complex on a coal mine. Russian Journal of Industrial Economics. 2021;14(1):89-96. (In Russ.) https://doi.org/10.17073/2072-1633-2021-1-89-96